Beneath murky water,
a clean record.
Operation & upgrade, Al Rusayl STP
Full-plant operation of the Rusayl sewage treatment works — extended aeration basins, secondary clarifiers and tertiary filtration — with staged upgrades delivered while the plant stayed on line — completed and handed back at design performance.
Aerial survey, 2026 — both process streams live during works.


Oil separator systems, five governorate STPs
Design, supply, installation and commissioning of pre-treatment with oil-water separator systems — 150 m³/day at Al Hamra, Izki, Bahla and Al Mudaybi, 250 m³/day at Samail — a permanent solution allowing oil-water tanker discharge into the STPs with safe disposal of the separated oil.
Sewage & tertiary plant, Coast Guard Raysut
Construction of a complete sewage and tertiary treatment plant at the Coast Guard Police Station, with additional works delivered at the STF / VIF facilities at Raysut, Salalah — design-build from ground to handover.
From first drawing
to final drop.
GHALA INDUSTRIAL ESTATE, BLOCK 260, WAY 6042, MUSCAT