Project Details : -
Client Name : – Oman Water and Waste Water Services Co.
Contractor : – Environmental Engineering Services LLC
Consultant : – Oman Water & Waste Water Services Co.
Project Completion : – 28th January 2021
The Design, Supply, Installation and Commissioning of Pre-treatment system with 150 m3/day Oil water separator system for Al-Hamra, Izki, Bahla, Al-Mudaybi and 250 m3/day for Samail Sewage Treatment Plants is intended to provide permanent solution to allow oil water tanker discharge into STPs and dispose the separated oil safely
The project involves major civil works with allied electro-mechanical works. The civil construction of tanker discharge bay, screen channel, grit tank, Oil water separator tank, RCC Holding tank and oil collection tank.